Several of the large trees on the GreenBuild site have been removed in preparation for the construction of the duplex which has been staked out on site by the Envinity team. The site plan has been designed to minimize the impact the homes have on the site landscape and vegetation, but several of the larger tree along the west side of the site were taken down to protect the homes and improve the potential for solar powering the homes. Check back with this blog over the next couple of weeks to see the construction of the GreenBuild duplex as it happens!
- « Previous Page
- 1
- …
- 4
- 5
- 6