Modular flooring installed in the Library Renovation April 29, 2016 by Seamus Staircase to the Second floor. There will be charging stations under the stair. At the end of the curve that will contain the 9 shared study spaces From the Bookshelf area toward the Cafeteria .
Alternative Study Spaces Schedule May 2nd through May 6th Posted April 28, 2016 by bdh5029 Alt Study Spaces 5/2-5/6
Data Lines installation continues April 28, 2016 by bdh5029 Data lines are now being run through the elevated hump that bisects the library
24 hour study lounge barrier wall is down April 28, 2016 by bdh5029 The glass knee wall has been finished in the 24 hour study lounge on the second floor.