This assignment was a homework assignment for AE 475. The assignment was to create a site logistics plan for the Agriculture building and North Halls. This site logistics plan was created using SketchUp. Multiple views of the site can be seen on a map I imported to sketch up. The site indicates the structural phase of construction. Attention was focused on safety, which included navigating the students around the site safely with crosswalks and signs. The plan indicates where traffic would be directed and construction traffic would cross from site to site. There is an area for material lay-down and employee parking and trailer. This project enhanced my understanding of considerations to be taken for the exterior environment of a site. This included understanding where pedestrian walkways and traffic patters would be affected and considered.