EDSGN 100
The objective of this project is to design a system for mining trucks to reduce carbon emission, eventually reaching a net zero carbon by 2030. Team Members Kyra Martindale Jerod Minich Carl Shelhamer Atahan Ozmen...
EDSGN 100
The objective of this project was to create a green, sustainable alternative to mining trucks without compromising on vehicle load capacity. Team Members Andrew Abrantes Jubei Tapia Bharat Reddy Domenic Yeakel ...
EDSGN 100
The objective of this project is to eliminate Wabtec’s diesel use by 2030 through the use of catenary systems. Team Members Elizabeth Mahoney Nick Miller Muhammad Fikri Mazli Hishman Swetha Suresh –...
EDSGN 100
This project aims to develop an alternative-powered open pit mine haulage system that replaces the current diesel-powered fleet, ultimately achieving net zero emissions. Team Members Nathaniel Ansu Nathan Duty Ulises Henriquez...
EDSGN 100
The objective of this project is to provide researched ideation for the electrification process of a mining fleet which WABTEC Corporation can utilize as a foundation for their 2030 net zero carbon emission goal. Team Members Alex Ackerman ...
EDSGN 100
The objective of this project was to both environmentally and economically improve the existing haulage truck systems present in open-pit mining operations through the use of clean, reliable energy and improved production costs. Team Members Ryan Baylis...