Today we installed the racking system which we mostly put together and labelled yesterday in prefab at Vegas. The group worked quickly and had the racks together and levelled before lunch.

Taylor and Rachel visited the school to meet with teachers. They want more information on solar to extend their solar power curriculum in technology class. The first half of the day, they teach younger kids and the second half I’d dedicated to the older kids, so they only go ton school for half a day up to 9th grade. The kids were very quick to learn how the solar panel worked and blocked our miniature panel with their hand to watch the light bulb dim with less light. They are very eager to learn!

After lunch, we oriented the racking south and leveled all the piping. Then holes were drilling into the cement atop the cistern and the racks were epoxied  down. Finally, the solar panels were delivered from customs, so we all carried them up to the work site. Tomorrow we attach and wire the panels together!!

Skip to toolbar