Penn State’s Office of Physical Plant will cutting-off all power to Boucke Building (Saturday 6AM) and Bank of America Building (Saturday 10AM) for maintenance. As a result, Student Affairs IT will be on-site Friday night and Saturday to:
- Install new un-interruptible power supplies in the Boucke Server Room (Friday 5PM)
- Power down all equipment in both Boucke and Bank of America Server Room (Friday 5PM)
- Power up all equipment in both Boucke and Bank of America Server rooms on Saturday 5PM when the power is expected to be restored.
A new post will be published when services are fully restored.