Dec 18 2017 Pouring the Floor Slab Today, the construction crew poured the concrete floor slabs for both homes. This wraps up the foundation of the homes; over the next several weeks, the team will begin framing the homes. Be sure to stay tuned as construction will surely speed up!
Leave a Reply
You must be logged in to post a comment.