We had a power interruption today to allow electricians repair a faulty circuit breaker. All mass spectrometers were down, and now we are getting back to operating conditions. This will cause some delays in your sample analyses.
I should be able to resume running Yuanjun’s samples on Monday, after Orbi gets stable temperature so I can calibrate it.
MALDI is ready.
LCT is pumping down.
QTrap is pumping down.